Clancy Construction Scale Away!
Clancy continue decarbonisation in construction with delivery of more of our systems for sites in Cork and Limerick.
The diesel savings were evident from our units when put under pressure during peak loads. Your generator idles optimally, rather than working overtime during the critical loads.

Integrated Systems
Clancy continue decarbonisation in construction with delivery of more of our systems for sites in Cork and Limerick.
The diesel savings were evident from our units when put under pressure during peak loads. Your generator idles optimally, rather than working overtime during the critical loads.

Savings all around.
Peak demand over a month on this site was 53.6KW with an average load of just 2KW. Over an entire month the generator ran for just 50 hours. That's a 24 hour supply (crane's lights need power at night) for just over 1.5 hours running per day. Cost savings estimated by this customer is 85%.

A Closer Look at “The Anatomy of a Peak”
Check out this example from a crane running off one of our 90kVA / 120kWh systems. When the crane lifts, it hit a sharp peak of 47kW, but that spike lasted only 5 or 6 seconds. Meanwhile, the average load in this snapshot is just about 2kW.

Off-Grid
Clancy continue decarbonisation in construction with delivery of more of our systems for sites in Cork and Limerick.
The diesel savings were evident from our units when put under pressure during peak loads. Your generator idles optimally, rather than working overtime during the critical loads.